Little Man Diner Limited Time Building (LTB) – Building Payout and Upgrade Cost – Crime City

So here is the next LTB, the Little Man Diner which has a small footprint and somewhat meager output. This is pretty much the norm these days. As usual, it’ll cost over $30 Billion to upgrade all the way. If you have the right modifiers you can drop that by half. the reward for each level is – Sinful Hot Cocoa atk-338,000 def-182,000 with +1% Explosive Defense. Not a great reward as you can get better by completing the first couple of levels of the latest Elite event.

Yes, no prizes for guessing I have two of these upgrading already. They may not be the coolest buildings, but I’m still going to buy and upgrade them. That’s just the way I do things. 🙂

As an aside, I’m steadily climbing to the next big money tier.

Base building cost and payout

Level Cost Income Hours
1 $130,754,944 $1,029,090 24
2 $218,360,756 $2,058,180 30
3 $364,662,463 $3,601,815 36
4 $608,986,314 $5,659,995 42
5 $1,017,007,144 $8,232,720 48
6 $1,698,401,930 $11,319,990 54
7 $2,836,331,224 $14,921,805 60
8 $4,736,673,144 $19,038,165 66
9 $7,910,244,150 $23,669,070 72
10 $13,210,107,731 $30,872,700 78
Total $32,731,529,800.00    

Building Payout with Modifiers

Level Payout +35% Payout +65%
1 $1,389,272 $1,697,999
2 $2,778,543 $3,395,997
3 $4,862,450 $5,942,995
4 $7,640,993 $9,338,992
5 $11,114,172 $13,583,988
6 $15,281,987 $18,677,984
7 $20,144,437 $24,620,978
8 $25,701,523 $31,412,972
9 $31,953,245 $39,053,966
10 $41,678,145 $50,939,955

Building Upgrade Cost with Modifiers

Level Upgrade -30% Upgrade -51%
1    
2 $152,852,529 $106,996,770
3 $255,263,724 $178,684,607
4 $426,290,420 $298,403,294
5 $711,905,001 $498,333,501
6 $1,188,881,351 $832,216,946
7 $1,985,431,857 $1,389,802,300
8 $3,315,671,201 $2,320,969,841
9 $5,537,170,905 $3,876,019,634
10 $9,247,075,412 $6,472,952,788
Total $22,820,542,399 $15,974,379,679

LTB Sheet All Buildings

Other articles of interest:

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Comments
  • Enter dates into a date picker for Chrome and Firefox (1)
    • Prasanna: Hello, How to enter a previous month FIRST day and LAST day from the system date. Thanks Prasanna
  • How To Disable the Quicken Registration Prompt (31)
    • Juani: Hi, I have a registered Quicken 2016 and now my files are being held hostage by Intuit, cannot log in with my ID unless I upgrade therefore buy a subscription, I need to access my files, please HELP. Thanks
    • David: A BIG Thank you! I regularly reinstall Windows OS’s using different hardware configs. In short, Quicken 2011 (it’s March of 2020 as I write this) has been a program I’ve been very happy with and continue to use....
    • Karen L: Today I rang Reckon Australia again, got a different guy and he talked me through the process of getting me a new product key to enter since I already had the licence and it had been extended. Reckon have only extended it by 1...
    • Karen L: I have Australian Quicken 2008 on Windows 8.1. It keeps asking me to renew my licence which Reckon did for me however the activation won’t work. I tried this to disable the registration prompt however it did not stop the...
  • Building Relationships with Developers (1)
    • Carlos Herrera: Ah yes. I have a team of software developers and it is genuinely so hard to keep them in the loop during projects. Though the more we work the better the communication becomes and we go from a trail and error process to a...
  • Integrating DevonAgent Pro with Alfred (1)
    • J. Garr: Beautiful, sweet, and simple. I love it; thanks for posting this solution.
  • Round and Round with the For..Next in Katalon Studio (1)
    • Sweet Ophaline Labador: Hello can you help me how to loop this scenario. Checking the elements is just the same. I want to check that the following function is available in www.siacargo.com: Track Shipment – clicking on this can...
  • Parsing Strings in Katalon – Split, Substring and Readlines (6)
    • Don Pedro: String tempText=”Date Month January. Revenue $1,355,721.00″ println(tempText.split(“ \$”)[1]) You need to escape the $ with \$ The [1] on the split captures characters on the right of the split [0]...
    • Prasad: Hi, I need to get the substring from the below string ‘Date Month January. Revenue $1,355,721.00’ I want to extract text after $ value. Please help Thank you
  • Working with Dates and Date Formatting in Katalon Studio (15)
    • Sangeethaa: How to get previous day’s date(Yesterday’s date)? Actually I was using today.previous() before,it was working fine till today morning.Now its not retrieving right date. Can anyone please guide me on this.
    • Don Pedro: That could be a little tricky. First, is the text/format always going to be the same? You will need to do some parsing. Separate the first but of text at 2019. After that, split the text again to get rid of Central Standard...
    • Don Pedro: It should be of the same Date type as today. You could then do some calendar trickery with Calendar /*Calendar c = Calendar.getInstance(); //c.set(Calendar.MONTH, 1) //Set the month, 0=January, 11=December println...
  • Output status messages and test information by writing to the Log File Viewer in Katalon Studio (6)
    • Saranya: Good One. Could you plz share link to access all your katalon related blogs. ThankQ
    • Rodrigo Calabretta: I’m using the KeywordUtil.markFailed or KeywordUtil.markError and my test stops is being shown as Error and If I use in the @afterTestCase the testCaseContext.getTestCaseSta tus() to show the status test case...