Time Clock Limited Time Building (LTB) – Building Payout and Upgrade Cost – Crime City

So that last LTB was a bit short on time wasn’t it? Mine are still upgrading as a matter of fact. Well, before you can blink it’s time for another. This time around we have the Time Clock LTB which is a ridiculously tall version of Big Ben, but it has the benefit of having a tiny footprint. They initial purchase price is $52,500,000 with a payout of $176,649 every 6 hours. The 6 hour collection time will probably distress people, but if this isn’t your cup of tea, pick one of the other buildings that’s still available for a limited time. And don’t forget, you can have more than 2 of any of the buildings listed. I have 3 of the Haunted Churches and 3 of the Diamond Grillz. I will probably have 4 of each before the month is over, just because.

The prize for completing this building is Clock Strikes Dead – 16,007 ATK 18,789 Def with 1% Explosive Defense. To be honest, not an amazing prize and there are no mods for this. You get the ATK/DEF bonus and that’s it.

To upgrade to Level 10 will cost over $13 Billion without modifiers. Your net payout will be over $13 Million over 6 hours. It’s possible this building could make you $40 Million a day if you can collect 3 times. Not great, but I collect these things just to have them. Now the question is, which building will I keep upgrading now that I have so many lying around.

Base building cost and payout

Level Cost Income Hours
1 $52,500,000 $176,649 24
2 $87,675,000 $529,947 30
3 $146,417,250 $1,059,894 36
4 $244,516,808 $1,766,490 42
5 $408,343,069 $2,649,735 48
6 $681,932,924 $3,886,278 54
7 $1,138,827,984 $5,476,119 60
8 $1,901,842,733 $7,419,258 66
9 $3,176,077,364 $9,715,695 72
10 $5,304,049,198 $13,248,675 78
Total $13,142,182,330.00    

Building Payout with Modifiers

Level Payout +35% Payout +65%
1 $238,476 $291,471
2 $715,428 $874,413
3 $1,430,857 $1,748,825
4 $2,384,762 $2,914,709
5 $3,577,142 $4,372,063
6 $5,246,475 $6,412,359
7 $7,392,761 $9,035,596
8 $10,015,998 $12,241,776
9 $13,116,188 $16,030,897
10 $17,885,711 $21,860,314

Building Upgrade Cost with Modifiers

Level Upgrade -30% Upgrade -51%
1    
2 $61,372,500 $42,960,750
3 $102,492,075 $71,744,453
4 $171,161,766 $119,813,236
5 $285,840,148 $200,088,104
6 $477,353,047 $334,147,133
7 $797,179,589 $558,025,712
8 $1,331,289,913 $931,902,939
9 $2,223,254,155 $1,556,277,908
10 $3,712,834,439 $2,598,984,107
Total $9,162,777,631 $6,413,944,342

If you want to fiddle with the number and align them to you personal modifiers, you can use this calculator posted by BrisingrBoss

Time Clock LTB from BrisingrBoss

Other articles of interest:

One Response to Time Clock Limited Time Building (LTB) – Building Payout and Upgrade Cost – Crime City

  • Munzio says:

    My iph has jumped from 115mil to 127mil…due to the income increase of the latest reposting of the ltbs…Gree is trying to get our hard earned pennies…lol

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Comments
  • Working with Dates and Date Formatting in Katalon Studio (15)
    • Sangeethaa: How to get previous day’s date(Yesterday’s date)? Actually I was using today.previous() before,it was working fine till today morning.Now its not retrieving right date. Can anyone please guide me on this.
    • Don Pedro: That could be a little tricky. First, is the text/format always going to be the same? You will need to do some parsing. Separate the first but of text at 2019. After that, split the text again to get rid of Central Standard...
    • Don Pedro: It should be of the same Date type as today. You could then do some calendar trickery with Calendar /*Calendar c = Calendar.getInstance(); //c.set(Calendar.MONTH, 1) //Set the month, 0=January, 11=December println...
    • josh: I’m testing a page with a string like “Updated November 21, 2019 16:25:32 PM Central Standard Time.” How might I capture the date and time and compare it to current time to verify that the update time was within...
    • zakir hussain: today = new Date() lastWeek = (today – 1.week) can u please help me in understanding what is the return type of lastweek? and I wanted to set nextyear date how can i do it
    • ALLAN FORD: Useful !
    • Don Pedro: Not sure I understand what you are trying to do.
  • Output status messages and test information by writing to the Log File Viewer in Katalon Studio (6)
    • Saranya: Good One. Could you plz share link to access all your katalon related blogs. ThankQ
    • Rodrigo Calabretta: I’m using the KeywordUtil.markFailed or KeywordUtil.markError and my test stops is being shown as Error and If I use in the @afterTestCase the testCaseContext.getTestCaseSta tus() to show the status test case...
  • Setting up Environment Profiles in Katalon Studio (2)
    • Don Pedro: Not quite sure I understand. The term “Execution Profile” is normally used now, but they are still GlobalVariables and are created in the same way for version 7 as previous. You make a new execution profile, then...
    • Aparna: Hello, Your documentation is excellent and has helped me understand many things. But this article above seems outdated and I need help in creating my own Global variables and all the documentation out there seems to be point to...
  • Here is my drive cluster (2)
    • Don Pedro: While I still have those drives, the drive cluster looks nothing like that now. Almost all of my external drives have had the cases removed and they have been installed into a series of MediaSonic 8 Bay Drive Enclosures. I...
    • Marin Boucher: Hi! Verry funny blog with “go to the point” on many post! I spent good time reading some of your post. Regarding this one about NAS, “many NAS” in fact, I would be curious to see a screenshot of...
  • How To Disable the Quicken Registration Prompt (27)
    • debra: didn’t work for me… my 2007 – which I am keeping on my older mac.
  • Adding entries to an open Excel spreadsheet during runtime (1)
    • IanG: Hi: Seems like nobody else has described (in detail) how Katalon can be configured to test an API by reading the first entry from a multi-row multi column XLSX spreadsheet, executing a test, writing the result to another column (or...