BeamNG Drive Comes to Steam

It’s been a long time coming, but BeamNG Drive has been given the Greenlight from Steam and will soon be available for Early Access purchase. If you bought the alpha builds through the BeamNG website you should get a Steam Key so that you can keep the game updated. This is really good news. Not only will the game stay updated, it means the devs have garnered enough support to really push this game to the next level.

If you’re not familiar with it, BeamNG Drive is a soft body physics game which is a fancy way of saying you beat the hell out of your vehicle and it will show and respond to the damage. The big fun of this game right now is to smash the stuffing out of your car or truck and watch the pieces fly in every direction as the body crumble like an empty beer can. There are some hilarious videos on YouTube showcases this destructive side of the game. My personal favorites involve the Mystery Machine going over the cliff or swerving down the road as though Fred is high as a kite.

So far the game has been a sandbox, but now that it’s hit the big leagues more and more features will be coming and I’m sure that will include some highly destructive racing. The placeholder for the game is already there so the ability to make a purchase should be here within a day or two.

BeamNG Drive on Steam

image

Other articles of interest:

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Comments
  • Enter dates into a date picker for Chrome and Firefox (1)
    • Prasanna: Hello, How to enter a previous month FIRST day and LAST day from the system date. Thanks Prasanna
  • How To Disable the Quicken Registration Prompt (31)
    • Juani: Hi, I have a registered Quicken 2016 and now my files are being held hostage by Intuit, cannot log in with my ID unless I upgrade therefore buy a subscription, I need to access my files, please HELP. Thanks
    • David: A BIG Thank you! I regularly reinstall Windows OS’s using different hardware configs. In short, Quicken 2011 (it’s March of 2020 as I write this) has been a program I’ve been very happy with and continue to use....
    • Karen L: Today I rang Reckon Australia again, got a different guy and he talked me through the process of getting me a new product key to enter since I already had the licence and it had been extended. Reckon have only extended it by 1...
    • Karen L: I have Australian Quicken 2008 on Windows 8.1. It keeps asking me to renew my licence which Reckon did for me however the activation won’t work. I tried this to disable the registration prompt however it did not stop the...
  • Building Relationships with Developers (1)
    • Carlos Herrera: Ah yes. I have a team of software developers and it is genuinely so hard to keep them in the loop during projects. Though the more we work the better the communication becomes and we go from a trail and error process to a...
  • Integrating DevonAgent Pro with Alfred (1)
    • J. Garr: Beautiful, sweet, and simple. I love it; thanks for posting this solution.
  • Round and Round with the For..Next in Katalon Studio (1)
    • Sweet Ophaline Labador: Hello can you help me how to loop this scenario. Checking the elements is just the same. I want to check that the following function is available in www.siacargo.com: Track Shipment – clicking on this can...
  • Parsing Strings in Katalon – Split, Substring and Readlines (6)
    • Don Pedro: String tempText=”Date Month January. Revenue $1,355,721.00″ println(tempText.split(“ \$”)[1]) You need to escape the $ with \$ The [1] on the split captures characters on the right of the split [0]...
    • Prasad: Hi, I need to get the substring from the below string ‘Date Month January. Revenue $1,355,721.00’ I want to extract text after $ value. Please help Thank you
  • Working with Dates and Date Formatting in Katalon Studio (15)
    • Sangeethaa: How to get previous day’s date(Yesterday’s date)? Actually I was using today.previous() before,it was working fine till today morning.Now its not retrieving right date. Can anyone please guide me on this.
    • Don Pedro: That could be a little tricky. First, is the text/format always going to be the same? You will need to do some parsing. Separate the first but of text at 2019. After that, split the text again to get rid of Central Standard...
    • Don Pedro: It should be of the same Date type as today. You could then do some calendar trickery with Calendar /*Calendar c = Calendar.getInstance(); //c.set(Calendar.MONTH, 1) //Set the month, 0=January, 11=December println...
  • Output status messages and test information by writing to the Log File Viewer in Katalon Studio (6)
    • Saranya: Good One. Could you plz share link to access all your katalon related blogs. ThankQ
    • Rodrigo Calabretta: I’m using the KeywordUtil.markFailed or KeywordUtil.markError and my test stops is being shown as Error and If I use in the @afterTestCase the testCaseContext.getTestCaseSta tus() to show the status test case...