The Run Time Limited Time Quest (LTQ) – Crime City

This is a two part LTQ where you need to defeat the NPC and collect loot items. The loot items themselves aren’t really that spectacular, but the reward weapons are pretty decent. As usual, you’ll need a lot of energy to get through this one. Like the other events I’ll do 2 or 3 levels and then abandon it. But hey, good luck!

Level Reward Atk Def
2 S.T.U.N. Runner 4065 4064
4 Flash Driver 7154 9104
6 Remote User 14144 10243
8 GUI Eyes 16258 24387
10 End User 46091 27070
  Run Time Motherboard 0 0
    -5% Building Upgrade Time
       
Run Time Item Set IDE Roadster 85275 50082
NPC Item Drops Reward Atk Def Bonuses
         
Run Time Recruit SMS Rifle 67 75  
  Explosive DEF Hack 0 0 +250 Explosive Defense
  DEL Package 451 399  
         
Run Time Thug Power Cycle 140 114  
  Melee DEF Hack 0 0 +600 Melee Defense
  Slashdot 770 1061  
         
Run Time Gunman GUI Suit 184 275  
  Gun ATK Hack 0 0 +1500 Gun Attack
  ALT Protocol 2348 1631  
         
Run Time Hacker Vector Grenades 471 369  
  Armor DEF Hack 0 0 +2000 Armor Defense
  Wrist CTRL 3900 6100  
         
Tilda Bracket LIFO Blade 447 592  
  Car ATK Hack 0 0 +8000 Car Attack
  Wardrive CMD 24800 15200  
         

The Run Time Limited Time Quest (LTQ) by Assault and Flattery

Other articles of interest:

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Comments
  • Enter dates into a date picker for Chrome and Firefox (1)
    • Prasanna: Hello, How to enter a previous month FIRST day and LAST day from the system date. Thanks Prasanna
  • How To Disable the Quicken Registration Prompt (31)
    • Juani: Hi, I have a registered Quicken 2016 and now my files are being held hostage by Intuit, cannot log in with my ID unless I upgrade therefore buy a subscription, I need to access my files, please HELP. Thanks
    • David: A BIG Thank you! I regularly reinstall Windows OS’s using different hardware configs. In short, Quicken 2011 (it’s March of 2020 as I write this) has been a program I’ve been very happy with and continue to use....
    • Karen L: Today I rang Reckon Australia again, got a different guy and he talked me through the process of getting me a new product key to enter since I already had the licence and it had been extended. Reckon have only extended it by 1...
    • Karen L: I have Australian Quicken 2008 on Windows 8.1. It keeps asking me to renew my licence which Reckon did for me however the activation won’t work. I tried this to disable the registration prompt however it did not stop the...
  • Building Relationships with Developers (1)
    • Carlos Herrera: Ah yes. I have a team of software developers and it is genuinely so hard to keep them in the loop during projects. Though the more we work the better the communication becomes and we go from a trail and error process to a...
  • Integrating DevonAgent Pro with Alfred (1)
    • J. Garr: Beautiful, sweet, and simple. I love it; thanks for posting this solution.
  • Round and Round with the For..Next in Katalon Studio (1)
    • Sweet Ophaline Labador: Hello can you help me how to loop this scenario. Checking the elements is just the same. I want to check that the following function is available in www.siacargo.com: Track Shipment – clicking on this can...
  • Parsing Strings in Katalon – Split, Substring and Readlines (6)
    • Don Pedro: String tempText=”Date Month January. Revenue $1,355,721.00″ println(tempText.split(“ \$”)[1]) You need to escape the $ with \$ The [1] on the split captures characters on the right of the split [0]...
    • Prasad: Hi, I need to get the substring from the below string ‘Date Month January. Revenue $1,355,721.00’ I want to extract text after $ value. Please help Thank you
  • Working with Dates and Date Formatting in Katalon Studio (15)
    • Sangeethaa: How to get previous day’s date(Yesterday’s date)? Actually I was using today.previous() before,it was working fine till today morning.Now its not retrieving right date. Can anyone please guide me on this.
    • Don Pedro: That could be a little tricky. First, is the text/format always going to be the same? You will need to do some parsing. Separate the first but of text at 2019. After that, split the text again to get rid of Central Standard...
    • Don Pedro: It should be of the same Date type as today. You could then do some calendar trickery with Calendar /*Calendar c = Calendar.getInstance(); //c.set(Calendar.MONTH, 1) //Set the month, 0=January, 11=December println...
  • Output status messages and test information by writing to the Log File Viewer in Katalon Studio (6)
    • Saranya: Good One. Could you plz share link to access all your katalon related blogs. ThankQ
    • Rodrigo Calabretta: I’m using the KeywordUtil.markFailed or KeywordUtil.markError and my test stops is being shown as Error and If I use in the @afterTestCase the testCaseContext.getTestCaseSta tus() to show the status test case...