Madame Knows Best Limited Time Quest and The Toy Box, Not For Kids Events

The Dock Rampage Event has just come to close and that sends us right in to Two brand new events for Crime City. The first is the Madame Knows Best LTQ which is a quest event in 40 parts which uses Energy to get the jobs done. The first levels will go quick, but obviously things are going to get rough toward the end. Like the previous event you get a new weapon for completing the odd levels and experience/cash for completing the even ones.

I like this sort of event, you’re guaranteed to get bigger and better weapons with each level. It’s not like the Epic Boss Event where you can get Level 1 items for completing a Level 10 fight.

The second part of the Event is The Toy Box, Not For Kids which is 20 days long and features an Adult Toy Store as the Limited Edition building. The initial cost is $35 million and it takes 24 hours to complete. They payout is $275,000 for every 12 hours at level 1. I just started building mine and like other buildings you will be able to have two of them. Considering this is 20 days, the upgrade time must be pretty steep.

Good luck everyone, looks like there is plenty to do this round. I came so close to completing the last event. I might be tempted to dip into the gold reserves for this one. And we’ll have to see how bad the upgrade time is for the Toy Store.

image

image

Other articles of interest:

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Comments
  • Enter dates into a date picker for Chrome and Firefox (1)
    • Prasanna: Hello, How to enter a previous month FIRST day and LAST day from the system date. Thanks Prasanna
  • How To Disable the Quicken Registration Prompt (31)
    • Juani: Hi, I have a registered Quicken 2016 and now my files are being held hostage by Intuit, cannot log in with my ID unless I upgrade therefore buy a subscription, I need to access my files, please HELP. Thanks
    • David: A BIG Thank you! I regularly reinstall Windows OS’s using different hardware configs. In short, Quicken 2011 (it’s March of 2020 as I write this) has been a program I’ve been very happy with and continue to use....
    • Karen L: Today I rang Reckon Australia again, got a different guy and he talked me through the process of getting me a new product key to enter since I already had the licence and it had been extended. Reckon have only extended it by 1...
    • Karen L: I have Australian Quicken 2008 on Windows 8.1. It keeps asking me to renew my licence which Reckon did for me however the activation won’t work. I tried this to disable the registration prompt however it did not stop the...
  • Building Relationships with Developers (1)
    • Carlos Herrera: Ah yes. I have a team of software developers and it is genuinely so hard to keep them in the loop during projects. Though the more we work the better the communication becomes and we go from a trail and error process to a...
  • Integrating DevonAgent Pro with Alfred (1)
    • J. Garr: Beautiful, sweet, and simple. I love it; thanks for posting this solution.
  • Round and Round with the For..Next in Katalon Studio (1)
    • Sweet Ophaline Labador: Hello can you help me how to loop this scenario. Checking the elements is just the same. I want to check that the following function is available in www.siacargo.com: Track Shipment – clicking on this can...
  • Parsing Strings in Katalon – Split, Substring and Readlines (6)
    • Don Pedro: String tempText=”Date Month January. Revenue $1,355,721.00″ println(tempText.split(“ \$”)[1]) You need to escape the $ with \$ The [1] on the split captures characters on the right of the split [0]...
    • Prasad: Hi, I need to get the substring from the below string ‘Date Month January. Revenue $1,355,721.00’ I want to extract text after $ value. Please help Thank you
  • Working with Dates and Date Formatting in Katalon Studio (15)
    • Sangeethaa: How to get previous day’s date(Yesterday’s date)? Actually I was using today.previous() before,it was working fine till today morning.Now its not retrieving right date. Can anyone please guide me on this.
    • Don Pedro: That could be a little tricky. First, is the text/format always going to be the same? You will need to do some parsing. Separate the first but of text at 2019. After that, split the text again to get rid of Central Standard...
    • Don Pedro: It should be of the same Date type as today. You could then do some calendar trickery with Calendar /*Calendar c = Calendar.getInstance(); //c.set(Calendar.MONTH, 1) //Set the month, 0=January, 11=December println...
  • Output status messages and test information by writing to the Log File Viewer in Katalon Studio (6)
    • Saranya: Good One. Could you plz share link to access all your katalon related blogs. ThankQ
    • Rodrigo Calabretta: I’m using the KeywordUtil.markFailed or KeywordUtil.markError and my test stops is being shown as Error and If I use in the @afterTestCase the testCaseContext.getTestCaseSta tus() to show the status test case...